← All articles

ARTICLE · DATA LEAK ACTIVE TESTING

Protecting intellectual property in manufacturing: CAD files and the IT/OT boundary

  • Sector
  • 6 min read
  • Updated
Blocks of electronic chips in a blue and purple chequerboard, an image of the industrial know-how to protectDrawings, CAD and the IT/OT boundary

The short version

  • Protecting intellectual property in manufacturing means controlling how drawings, CAD files, bills of materials and recipes leave the business.
  • DLP rules read CAD formats, archives and exports badly, and say nothing when they miss.
  • Subcontractors and the IT/OT boundary are the blind spots; test them with synthetic files.

To find out whether intellectual property can leave a manufacturing site, push synthetic CAD files out along the routes an engineer, a subcontractor or a shop-floor PC would use, then check each attempt against your DLP and proxy logs.

Manufacturing IP is scattered across the plant

In a bank, sensitive data often sits in a customer database. In manufacturing, it is scattered: a CAD assembly of several hundred files, a CNC program on a shop-floor USB stick, a process routing in the ERP, a specification sent to the mould supplier. Under the Trade Secrets (Enforcement, etc.) Regulations 2018, protection depends on reasonable steps to keep the information secret; an egress control nobody has tested is weak evidence of those steps.

Three things make defending it harder:

  • Formats that DLP understands poorly. Native parts and assemblies (.sldprt and .sldasm in SolidWorks, .CATPart and .CATProduct in CATIA, .prt in NX or Creo) carry none of the text patterns most rules look for. Even a STEP file, though plain text, is just a list of geometric entities.
  • Partners you have to share with. Design offices, subcontractors, toolmakers, test laboratories: sharing is the business. Blocking every exchange is not an option.
  • Two networks that barely talk to each other. The shop floor has its own equipment and supervisory workstations, and sometimes remote maintenance access run by the machine suppliers.

Not every leak comes from outside. The engineer who leaves for a competitor with a copy of their workspace is covered in our article on the insider threat and trusted users.

CAD files: the link your rules ignore

Most of the industrial DLP policies we come across rely on two mechanisms: the file extension and classification labels. Both break easily.

Where detection fails

  • An assembly compressed into an archive, possibly encrypted, is no longer recognised by its extension.
  • An export in a neutral or mesh format (STL for 3D printing, for example) often loses the label applied to the original file.
  • A screenshot or a PDF of a drawing carries the essential information without triggering any rule based on file type.
  • Files extracted from the PLM (Windchill, Teamcenter, 3DEXPERIENCE) to a local folder leave the scope where classification is enforced.

These failures are silent: the console stays green, as with most DLP false negatives. Without reliable classification of technical data, the DLP has nothing to go on either; see our article on how DLP depends on classification.

Combining signals, and their limits

Combine signals rather than chase every format: marking at the source, the volume and context of the exit (gigabytes to personal storage on a Friday evening), and fingerprinting where it works. Most DLP fingerprinting and exact data match work on extracted text; on binary CAD files you fall back to exact file hashes, which break on any edit or re-export. Two things hold up better: a marker string in the drawing title block, which usually survives into PDF and DXF output, and export logging in the PLM itself.

To check your own rules, zip a dummy .sldprt and its STL export with a password, upload it to a personal account, and look for the event in Purview Activity explorer or your proxy logs.

Subcontractors: sharing without losing control

Subcontractors need your drawings. What you control is the channel, what exactly is sent, and what happens when someone goes round the official route.

Exchange channel Main risk What to check
Secure exchange portal or supplier PLM Rights too broad, links that never expire What is shared in practice, how long access lasts, logging
Email with attachment Sending a complete assembly instead of just the part needed Outbound rules on technical files, including inside archives
Consumer file transfer service Uncontrolled channel, bypassing a portal deemed too slow Blocking or detection of uploads from the browser
Subcontractor remote access to your systems Direct copy from your servers Filtering of outbound transfers on the remote session

Check your own outbound side before auditing the subcontractor’s: it is the half you control. Third parties more broadly are covered in data leakage at third parties and subcontractors.

The IT/OT boundary: a DLP blind spot

Diagram · where technical data gets out

Where a manufacturer’s technical data gets outOn the IT side, technical data lives in the PLM and CAD, the ERP and the engineers’ workstations; on the OT side, in the supervisory systems, the CNC programs and the recipes. A boundary separates them, crossed by gateways. The exits to watch: subcontractors, cloud and email on the IT side; remote maintenance and removable media on the shop floor side.IT · businessPLM and CADERPEngineers’ PCsOT · shop floorSCADA and HMICNC programsRecipesSubcontractorsCloud, emailRemote maintenanceRemovable media

DLP tools are designed for business IT. Industrial networks are often out of their reach: supervisory workstations with no agent, PLCs, historian servers, old operating systems that cannot be modified without revalidating the line.

Yet these networks hold intellectual property too: CNC programs, process parameters, recipes. And there are ways out:

  • data flowing up to IT (historian, MES, ERP), which creates gateways;
  • remote maintenance access for machine builders;
  • the removable media used to load programs onto the machines;
  • the “dual use” workstations that are plugged in on the shop floor one day and in the office the next.

Do not put endpoint DLP on OT equipment: it is rarely possible, and an agent that crashes stops a line, not just a PC. Watch the IT/OT DMZ instead (Purdue level 3.5) and the IEC 62443 conduits that link it to each side: the outbound flows that cross them, and removable media on the shop floor. If your segmentation already follows 62443, the conduit list is your list of exits to test. Testing network controls is covered in our article on egress filtering and network DLP.

An engineer working their notice: five exits to test

A process engineer hands in their notice and keeps PLM and shop-floor access until they leave. Build the test set first: a generated STEP or SolidWorks assembly, sized like a real one, with a canary part number and a marked title block so you can trace it in every log. Then answer five questions:

  1. Does a bulk extraction from the PLM to their workstation generate an alert, and who receives it?
  2. Is copying the archive to a personal USB stick blocked or merely logged?
  3. Is the upload to personal cloud storage from the browser detected?
  4. Does a message to a personal address, with the file renamed, get through the email filter?
  5. Is a transfer from a less monitored shop-floor workstation visible?

Illustrative example, made-up figures: the dummy assembly, split into 12 files and uploaded to a personal Google Drive from the browser, comes back as 12 attempted, 12 transmitted, 7 collected. The proxy log shows all 12 leaving with no rule firing; the five missing files failed on the Drive side, so nothing on your side stopped them. USB, email and the shop-floor PC need separate tests.

Next step

The browser route out of an engineer’s PC

The 30-minute demo runs on pre-built results: a campaign across the 8 channels, including HTTPS and Google Drive, the browser route in the scenario above, with nothing to install and no access to your environment. For a first result on your own network, the POC (quick, usually free) runs a standard scenario with synthetic data from a representative machine, through your real egress controls. The paid pilot extends the measurement to a limited part of your production.

What an industrial CISO should check

  • Inventory the technical data to protect and its actual locations (PLM, file shares, workstations, shop floor).
  • Check that DLP rules cover native and neutral CAD formats and archives.
  • Map the exchange channels with each category of subcontractor.
  • Identify the gateways between IT and OT, including remote maintenance access.
  • Put rules around removable media on the shop floor.
  • Agree enhanced monitoring for sensitive leavers with HR and legal; under UK GDPR that usually means a DPIA, and the ICO’s guidance on monitoring workers is the reference.
  • Test every control with synthetic data, then test again after every change.

The general method is set out on our page on data exfiltration testing.

Frequently asked questions

Does a standard DLP protect CAD files?

Partially. Extension, label or fingerprint: each tends to disappear after compression, an STL export or a screenshot. Only a test on your own formats shows what is covered.

Can exfiltration be tested without exposing real drawings?

Yes, and you should: use synthetic files that carry the structure and markers of the real ones but no industrial value.

Should the OT network be included in the tests?

Test the IT/OT boundary, not the equipment, and agree each test with the shop-floor managers so production is never disrupted.

Where do subcontractors fit in?

First test your own exits towards them: authorised channels, possible bypasses, volume sent. Their own security is a matter for contract clauses and audits.

Your design data’s exit routes, measured

We push synthetic data through the real egress controls your drawings would cross, each scenario tied to its MITRE ATT&CK technique, and measure what was attempted, transmitted and collected on each route out. Then we help you decide which route to close first.